Roby Mill Primary School
For this job, a basic and simple job timeframe was of paramount importance as the boiler had gone down and needed replacing urgently.
We were required to be on site ASAP working alongside LCC and James Mercer Group to ensure the boiler could be replaced as quickly as possible.
- Client: James Mercer Group
- Contract Period: 6 days
- Contract Type: Removal of Asbestos Residue and Re-sealing of wall
- Value: £5,500