Sandylands Primary School
Walter Carefoot engaged Weldlag to undertake the removal and re-lagging of the Asbestos Insulation in the loft area of the school.
The set-up of the works required us to consider how to create a safe working method with access being through a shared entrance. The works were undertaken ahead of timeframe allowing Walter Carfoot Plc to continue their works without delay.
- Client: Walter Carefoot Plc
- Contract Period: 5 weeks
- Contract Type: Removal of Asbestos Insulation and re-lagging
- Value: £40,000