School In Morecambe
An investigation into a leak under the floor of one of their classrooms proved to be located in a duct that was partially contaminated with Asbestos.
Read more
Boiler Room In Manchester
During a re-development in Manchester, Asbestos insulating board and pipe lagging was discovered in the boiler room of the property.
Read more
White Chapel Primary School
Our work in the boiler room included pipework removal and the removal of paint using a Blast & Breathe Removal System.
Read more
Winter Gardens Blackpool
Removing asbestos sheets and rope seal to a strict time schedule at a considerable height, in difficult conditions provided a real challenge.
Read more
Sandylands Primary School
A safe working method was paramount during the removal and re-lagging of the Asbestos Insulation in the loft area of the school.
Read more
Roby Mill Primary School
For this job, we were required to be on site ASAP as the boiler had gone down and needed replacing urgently.
Read more
Glenburn College
We were contracted to cut out and remove the asbestos packers from concrete sections without damaging the integrity of the building.
Read more
Retail Premises Blackpool
Working directly for the property owner works were completed in a large retail unit in a very busy main street in Blackpool town centre.
Read more